design and processing capacity of silver ore concentrator cost

design and processing capacity of silver ore concentrator cost

Kinross says that, with a cost of sales of about $205 per ounce on a The Kupol mill is designed to process about 3,000t of ore per day (1,100,000t per year). gold and silver will be carried out with a Knelson concentrator in the grinding circuit. For electrical power, the installed generating capacity is about 25MW with an 

[email protected]

latest news