The slurry from the regrind mill is pumped into a carbon in leach (“CIL”) plant consisting of eight, 600 cubic meter leach tanks equipped with 45 kW agitators where leaching at 50% solids and simultaneous adsorption of dissolved gold onto activated carbon takes place. The CIL plant has a nameplate capacity of 3,800 tonnes of milled ore per day.